LEIGH BARRIER GAUGEBOARD INSTALLATION – MARCH 2022 – RESERVOIR AND WATER SERVICES
NORTHERN GATE

Note red pointer between the two radial arms at the bottom of the gate.
CENTRAL GATE

SOUTHERN GATE

Note red pointer between the two radial arms at the bottom of the gate.
VERTICAL BOARD ON LEFT-HAND DOWNSTREAM TRAILING WALL

STAGGERED BOARDS (3 MORE TO INSTALL FROM 29m UP TO 32m)


STAGGERED BOARDS ALONGSIDE SLOPING ACCESS TRACK